Under the hydraulically driven steel dome of the Qatar World Cup's openable roof, and between the 100-meter suspended steel trusses of the Beijing Winter Olympics' “Snowy” ski jumping stadium, Steel Structure technology is breaking through the boundaries of traditional architecture. By integrating parametric design, intelligent construction and eco-technology, the modern steel structure stadium has evolved into a city landmark integrating function, art and technology.
I. Revolution of Large-Span Space Structure
Free-form Mesh Shell System Adopting two-way orthogonal orthotropic mesh shell structure, Shenzhen Bay Sports Center realizes a single-span 230m column-free space with steel consumption of only 98kg/㎡. The nodes are connected by cast steel hollow balls, and the bearing capacity of the 600mm diameter ball nodes reaches 8,500kN, which is 35% lighter than the traditional welded nodes.
Tension beam suspension composite system The Nanjing Youth Olympic Stadium applies the combination of 120mm diameter steel cables and H-type steel beams to form a self-balancing force system. 180m span roof structure is only 12m in height, and the wind vibration coefficient has been reduced to 0.85, which saves 28% of steel compared with the pure truss program.
Rapid construction technology breakthrough
Prefabricated assembly construction system A gymnasium in Xiong'an New Area adopts 3D modular steel units (size 12×12×6m), and through BIM-guided robot welding, the on-site installation speed reaches 2,000m2/day. Its bolted nodes account for 85%, shortening the construction period by 60% compared with traditional welding construction.
Intelligent Measurement and Correction System Hangzhou Olympic Sports Center applies laser tracking instrument (accuracy ±0.03mm) to monitor the installation and positioning of 32,000 steel components in real time, controlling the cumulative error within 15mm, and realizing the millimeter-level joining of the roof cover with a diameter of 320m.
Third, innovation of architectural form expression
Parametric Surface Generation Technology Phoenix Hill Stadium in Chengdu adopts NURBS surface algorithm to generate a double-layer steel mesh shell containing 86,000 rods with different curvatures, with the maximum bending and torsion angle of 32°, and the overall modeling error is ≤5mm. its complex nodes are cast in wax molds through 3D printing, realizing 100% morphological restoration.
Application of Bionic Structure System The Qatar 974 Stadium draws on the honeycomb structure, using 974 standard container modules combined with steel frames, which can be completely disassembled and reorganized after the game. The modular nodes have a shear bearing capacity of 1,200kN, and the disassembly reuse rate reaches 95%.
Green and Sustainable Technology Integration
Photovoltaic-structure integration design Foshan International Sports Center integrates CdTe thin-film batteries (conversion efficiency of 19%) on the surface of the steel mesh shell, with an annual power generation of 3.8 million kWh, which accounts for 65% of the energy consumption of the venue. Its special photovoltaic panels have a wind pressure resistance of 5.5kPa and are synergistically stressed with the structure.
Rainwater Recycling Steel Structure System The steel roof of the Singapore National Stadium is equipped with 2,600 water-conducting gutters, which, together with the siphon drainage technology, collects 120,000 tons of rainwater annually and meets 75% of the water demand for greening. Its stainless steel water-conducting components have a corrosion-resistant life of 50 years.
Inner Mongolia Shenghua Steel Structure Engineering Co., Ltd
Contact: Manager Gao 13848510731 13848517732
Landline number: 0471-6490861
Address: 800 meters from Jinhe Expressway exit, Jinqiao
Development Zone, Hohhot, Inner Mongolia
Copyright © 2025 Xinzhongju Steel Structure Color Plate Co., Ltd All rights reserved Filing No.: CP Bei No. 000000
This website uses cookies to ensure you get the best experience on our website.
Comment
(0)