In a zero-carbon park in Xiongan New Area, the average daily power generation of photovoltaic-integrated steel curtain wall reaches 130% of the building's energy consumption; in a super-high-rise building in Guangdong, Hong Kong and Macao Bay Area, 98% of the materials in the whole building are recycled by removable steel components; in an eco-community on the Loess Plateau, the steel-wood hybrid structure reduces carbon emissions by 62% compared with the traditional building. These practices reveal that the green design of Steel Structure buildings is breaking through the traditional boundaries to form a sustainable solution covering the whole life cycle.
Material revolution reshapes the ecological base
The application of high-strength steel promotes weight reduction design. A demonstration project adopts Q690 high-strength steel, reducing the cross-section height of the main beam by 40% and the overall steel consumption by 22%. The application of weathering-resistant steel in an ecological building complex in Chengdu eliminated the need for painting the exterior maintenance structure, reducing VOC emissions by 8.6 tons over the entire life cycle. The utilization rate of recycled steel breaks through the industry's bottleneck. A renovation project in Shenzhen realizes the reuse of 85% of the original steel through the regeneration technology of old steel structures.
New composite materials expand performance boundaries. Basalt fiber reinforced steel components in a coastal building in Qingdao, corrosion resistance increased by 300%. Phase-change energy storage steel plates are used in an office building in Guangzhou to reduce air-conditioning energy consumption by 35% by absorbing heat energy through phase-change materials. Graphene-modified fire-resistant coating is applied in a steel structure residence in Nanjing, with a thickness of only 1/3 of traditional products and a fire-resistant time limit of 3 hours.
Intelligent Design Empowers Efficiency Leapfrog
BIM+AI collaborative design system realizes accurate optimization. A convention and exhibition center project generated 300,000 structural solutions through algorithms, and the final selection reduced steel consumption by 18% compared with the initial design. The application of parametric design tools in a shaped steel building in Hangzhou streamlined component types from 256 to 89, and reduced the processing loss rate to 1.2%.
Digital twin technology builds a virtual verification closed loop. The virtual prototype of a super high-rise building in Shanghai simulated and verified the structural performance under 20 extreme climatic conditions, and guided the design team to optimize the connection nodes, reducing the wind vibration response by 27%. The energy model of an airport terminal building identified the best PV steel structure integration scheme through 100,000 iterations of calculation, and the annual power generation was increased to 115% of the design target.
Innovation of Clean Construction Technology System
Modular prefabrication technology breaks through traditional limitations. An assembly community in Xiongan adopts 3D steel modular units, shortening the on-site construction cycle by 70% and reducing the amount of construction waste generated by 92%. Intelligent welding robots were applied in the Hong Kong-Zhuhai-Macao Bridge port complex, raising the pass rate of weld seams from 95% to 99.9% and reducing energy consumption for rework by 80%.
Fourth, energy system integration innovation
Photovoltaic-structural integration technology breaks through space limitations. The hyperbolic photovoltaic roof of a steel structure office building in Beijing has a power generation efficiency of 235W/m2 per unit area, which is 1.8 times higher than that of the traditional flat scheme. A stadium's steel grid frame integrates CdTe thin-film batteries, and the annual power generation meets 60% of the stadium's energy demand.
Ground source heat pump and steel substrate synergize to supply energy. An experimental building in Tianjin integrates heat pump piping with steel columns, utilizing the thermal conductivity of the steel structure to improve heat transfer efficiency by 40%. The phase change energy storage steel wall panel system was applied in a commercial building in Changsha, reducing the daytime air conditioning load peak by 42% through nighttime cold storage.
Inner Mongolia Shenghua Steel Structure Engineering Co., Ltd
Contact: Manager Gao 13848510731 13848517732
Landline number: 0471-6490861
Address: 800 meters from Jinhe Expressway exit, Jinqiao
Development Zone, Hohhot, Inner Mongolia
Copyright © 2025 Xinzhongju Steel Structure Color Plate Co., Ltd All rights reserved Filing No.: CP Bei No. 000000
This website uses cookies to ensure you get the best experience on our website.
Comment
(0)